Today we checked with the production supervisor, that assembly production line, glue production line, and packing production line, each with 15000pcs item finished every day, that means one month we able finished over 350000pcs, but with the conditional that all the raw materials must in place timely. The end of 2020 is a tough battle and we must do our best.