1. Before installing the LED flood light, in order to ensure the quality of its use after installation, it is recommended to conduct a detailed inspection of the flood light present before installation to see if the appearance of the LED flood light is damaged and whether the accessories are complete. After-sales service, etc., each item must be carefully checked.
2. After the appearance is not damaged and the accessories are complete, start to prepare to install the LED floodlights. First, organize the installers according to the installation drawings attached to the factory, and first connect a few floodlights to try if the installation drawings are correct. If conditions permit, you can arrange for one person to test the lights one by one, so as to avoid taking them upstairs and installing them, and they will have to be broken down after they are installed.
3. Remind the installation workers of the importance of fixing and wiring, especially the waterproof of outdoor wiring is very important, it is best to review it when fixing and wiring.
4. After the LED flood light is fixed and connected, it is best to use a universal meter on the main power supply when it is ready to test light.
5. After all the LED floodlights have been tested for lighting, try to light for as long as possible, and check again on the second and third days. After doing this, all are good, and there will be no problems later.